The treatment of drilling waste is to control the water content of drilling cuttings in drilling mud.

The treatment of drilling waste is to control the water content of drilling cuttings in drilling mud, stabilize the performance of liquid phase, and achieve the purpose of dry treatment. The liquid phase can be used for secondary injection without destroying, so that the enterprises can expand the drilling scale without environmental protection worries.

The use of drilling mud not landing system eliminates the direct digging and circulating pool, reduces the land use, reduces the related costs, and reduces the workload of well crew. More importantly, once the system is put into use, it can not only realize harmless treatment of drilling mud and solid waste, but also recycle both of them, which is environmentally friendly and energy-saving. Mud pollution to the environment will be largely eradicated, so as to create a “green” logo, oil drilling exploration field to create greater social and economic benefits.

Solid liquid separation and waste residue recovery stage: drilling mud through the elevated manifold into the mud vibrating screen to remove large solid particles, and then sand pump pumping treated mud into the desander, desilter to remove sand and mud, mud treatment in the mud, the treated mud into the mud tank for further treatment.